Product Details
1. No wapping, no fracture, not out of shape, it can stay 24 hours in boiling water.
2. Good performance and more turnover use time.
3. It is easy to take off the membrane;Time is only 1/7 of the steel mould.
4. Make the surface of concrete more smooth and beautiful, so it can be easy to make decoration and it also deduct the processing of plastering.
5. This can moderate and contact 30% time for a project.
6. Corrosion resistant and it will not pollute the surface of concrete.
7. It is good to keep performance warm, is favorable to make construction in winter.
8. Products can be made into warping plywood.
9. It is better to nail,saw,drill than bamboo and steel mould, it can be processed


|
Name |
Template specifications for high-rise buildings |
|
Size |
1830*915,1220*2440 mm or upon request |
|
Thickness Tolerance |
4-25mm or upon request |
|
Core |
Finger joint core |
|
Film options: |
Domestic Black or Brown film Dynea film |
|
Edge |
Sealed with water proof paint, paint color can be upon request |
|
Glue |
Mr, Melamine, Phenolic WBP |
|
Formaldehyde Emission level |
Carb,E0,E1,E2 |
|
Moisture content |
8%-12% at the time of shipment |
|
Usage |
Real estate construction /formwork panel |
|
Package |
Outer packing: pallets are covered with plywood or carton boxes and |
|
Delivery time |
Within 2-3 weeks upon down payment or upon opening of L/C |
|
Min Order |
1*20'ft |
|
PAYMENT TERM |
TT or L/C |
|
Supply ability |
10000 M3/per month |




FAQ
Q1:Can you provide samples? Is the sample free?
A1:We can provide samples. Sample is not free. But we can reduce the cost in thenext order.
Q2:How does your factory do the quality control?
A2:We have quality inspection department, each process has the corresponding quality control standards, each workshop is equipped with quality inspection personnel. Always a pre-production sample before mass production; Always final Inspection before shipment;
Q3: What is your terms of payment?
A: 100% L/C at sight. 30% T/T in advance, 70% L/C at sight, 30% T/T in advance, 70% T/T before delivery. Photos of the products and packages will be sent to you before goods loading.
Q4: I want to make payment in DP, is that ok? I don't want to pay deposit, ok?
A:We need to get deposit 30% as meaning of confirming order at the beginning, we can do DP in the future for regular business partner.
